Distributor Spotlight: For E-Finity, The Goal Was To Be The Best Capstone Distributor From Day 1
It was 1991 when Jeff Beiter first took on the mission of championing energy conservation throughout the mid-Atlantic states.
It was 1991 when Jeff Beiter first took on the mission of championing energy conservation throughout the mid-Atlantic states.
Located in the heart of Los Angeles’ San Fernando Valley, Capstone’s 70,000-square-foot manufacturing facility is where everything comes together: technical know-how and testing, precision and performance. We take great pride in all the hard…
A Closer Look at Capstone’s Manufacturing Process: Read More
Founded in 1988, Capstone Green Energy develops, manufactures, sells and services microturbine energy solutions ranging in size from 30 kilowatts (kW) to 10 megawatts (MW).